Thyssenkrupp Levant Stair Lift Installation Manual Top

Carefully lift the chassis and align its rollers with the rail channels. Slowly slide the chassis down into the rail.

of the stairs. The lift must always be parked on a charging contact to prevent battery depletion. Swivel Function : The Levant features a swivel seat handle

Even experienced technicians encounter issues. The ThyssenKrupp Levant manual includes a dedicated matrix for top-related problems. Here are the top three, verbatim from the guide: thyssenkrupp levant stair lift installation manual top

The internal copper charging strips run inside the channel of the aluminum rail. Ensure they are clean, free of dust, and completely continuous across any rail joints. Use the provided plastic joint pins to align the segments perfectly. Joining Rail Sections (If Applicable) Lay the rail sections flat on a protected floor surface.

: For electrical connections and housing covers. Wire Strippers : To prepare the low-voltage charging lines. Step-by-Step Installation Process 1. Unpacking and Inspecting Components Carefully lift the chassis and align its rollers

: The tractor/drive unit is prepared and driven onto the rail system.

Impact driver, torque wrench (8–25 Nm), digital level, wire strippers, multimeter, 5mm & 6mm hex bits, track alignment tool (ThyssenKrupp part #7024051), 2-person lifting sling. The lift must always be parked on a

The manual lists unique requirements for the top landing:

Before starting the installation, please read and understand the following safety precautions:

Reason: The cap prevents the carriage from sliding off the rail during installation. Premature removal can cause the 50lb carriage to fall.

Note: For complex electronic error codes displayed on the main circuit board diagnostic LED, consult a certified ThyssenKrupp accessibility technician.

Back to Top