Stenhoj Ds2 Manual _hot_ Jun 2026
performed by an authorized specialist. Key maintenance tasks include: Autosfera.lt Spindle Lubrication
No power supply, blown fuse, or tripped thermal overload on the motors.
: The vertical screws require regular lubrication to reduce friction between the load nut and the spindle. Nut Wear Measurement stenhoj ds2 manual
As soon as the lift leaves the floor, automatic mechanical locks engage to prevent the swing arms from shifting horizontally while holding a load. 5. Routine Maintenance and Lubrication
Using the control console to safely raise, park, and lower the load. Maintenance and Lubrication performed by an authorized specialist
Electronic or mechanical cable synchronization depending on the generation. Lifting Time: Approximately 45–50 seconds.
: The most reliable source for manuals and spare parts lists is the STENHØJ File Archive Nut Wear Measurement As soon as the lift
Includes a nut breakage system and mechanical safety ratchets.
~1,900 mm to 2,000 mm depending on pad adjustment. Minimum Pad Height: ~95 mm to 110 mm.
Let’s walk through a typical programming procedure as described in the official manual. Ensure you have safety lockout/tagout in place before starting.