Manual !!better!!: Samsung Aj068txj3kg Eu Installation |
Charge the system with nitrogen gas to test for leaks at the flare joints.
Mistaking power for communication lines destroys the PCB.
Installers registered with Samsung’s HVAC partner program can log into the app or website for technical bulletins and updated manuals.
Connect a dedicated outdoor power line to the main terminal block ().
Hold the pressure for a minimum of 24 hours. If the pressure drops (accounting for ambient temperature fluctuations), use a soapy bubble solution or an electronic leak detector to find and repair the leak. Triple Evacuation Method Release the nitrogen charge safely.
are the communication bus lines. Use a minimum of 0.75 mm² up to 1.5 mm² shielded or unshielded cable depending on local regulations (Samsung recommends a continuous, splice-free wire harness).
A stable foundation minimizes vibration, reduces noise, and extends the lifespan of the compressor. Ground Mounting
A stable foundation prevents vibration noise and structural damage over time. Ground Mounting
Minimum 1000 mm if the unit is installed beneath an awning or overhang. 3. Refrigerant Piping and Mechanical Connection
Always shut off the main power supply before touching any electrical components.
What (e.g., wall-mounted, slim duct, or cassette) are you pairing with this outdoor unit?
The outdoor unit requires unrestricted airflow to prevent short-cycling and overheating. Ensure the following minimum clearances around the unit chassis: At least 300 mm of open space.
|
Company > Contact Us > About Patton > Jobs > Capabilities > Quality & Responsibility > Legal News & Events > Press Room/Releases > Training & Events > Library/Downloads |
Charge the system with nitrogen gas to test for leaks at the flare joints.
Mistaking power for communication lines destroys the PCB.
Installers registered with Samsung’s HVAC partner program can log into the app or website for technical bulletins and updated manuals.
Connect a dedicated outdoor power line to the main terminal block ().
Hold the pressure for a minimum of 24 hours. If the pressure drops (accounting for ambient temperature fluctuations), use a soapy bubble solution or an electronic leak detector to find and repair the leak. Triple Evacuation Method Release the nitrogen charge safely.
are the communication bus lines. Use a minimum of 0.75 mm² up to 1.5 mm² shielded or unshielded cable depending on local regulations (Samsung recommends a continuous, splice-free wire harness).
A stable foundation minimizes vibration, reduces noise, and extends the lifespan of the compressor. Ground Mounting
A stable foundation prevents vibration noise and structural damage over time. Ground Mounting
Minimum 1000 mm if the unit is installed beneath an awning or overhang. 3. Refrigerant Piping and Mechanical Connection
Always shut off the main power supply before touching any electrical components.
What (e.g., wall-mounted, slim duct, or cassette) are you pairing with this outdoor unit?
The outdoor unit requires unrestricted airflow to prevent short-cycling and overheating. Ensure the following minimum clearances around the unit chassis: At least 300 mm of open space.